Procedure Index For IHRG, MSN-99-789
Procedure # | Procedure Title | Rev | Effective Date |
---|---|---|---|
100-1 | Gas Injection System | 1.0 | 7/00 |
100-2 | PPE Requirements | 1.0 | 7/00 |
100-3 | Operator Logs | 4.0 | 7/00 |
100-3E | Operator Logs | 4.0 | 7/00 |
100-3Po | Operator Logs | 4.0 | 7/00 |
100-4 | Startup and Shut Down Checklist | 3.0 | 7/00 |
100-5 | Unattended Operations | 3.0 | 7/00 |
100-5E | Unattended Operations | 3.0 | 7/00 |
100-6 | Acceptance Testing Document (ATD) | 1.0 | 7/00 |
200-1 | Corrosion Cell Assembly | 3.0 | 7/00 |
200-2 | Furnace Operation | 3.0 | 7/00 |
200-3 | Corrosion Cell Disassembly | 2.0 | 7/00 |
200-5 | Pb - Tapping | 4.0 | 01/01 |
200-6 | NaOH/Pb Corrosion Cell Assembly | 4.0 | 01/01 |
200-7 | Pb and NaOH Sampling | 4.0 | 01/01 |
300-1 | Gas Handling Train | 2.0 | 7/00 |
300-2 | Ventilation | 2.0 | 7/00 |
Revision Notes
- Rev. 0.0 was the initial set of procedures submitted to the IHRG committee, on 10/11/99.
- Rev. 1.0 incorporated the corrections, comments, suggestions, requirements as provided by Gary Roberts and Doug Ardary, completed 10/26/99.
- Rev. 2.0 incorporated the corrections, comments, suggestion from the second IHRG review held on April 24, 2000 .
- Rev. 3.0 incorporated corrections based on experimental runs 1 and 2.
- Rev. 4.0 expanded the use of these SOP's for use in the IHRG Titled: "Clean-up Pb-Bi Coolant" MSN-00-872. Procedure 200-05 was modified (per Gary Roberts's recommendation) during the IHRG. Procedures 200-6 and 200-7 were added and reviewed during the IHRG. Procedure 100-3 were updated to reflect the Mass Spec.